- 显示所有
- Asset Management
- 浮标
- 运河
- Climate Change
- 控制
- 大坝安全
- Environmental Impact
- Fish 而且 Aquatic 资源
- Future Grid
- 发电机
- 州长
- Hydraulic Forecasting
- Hydraulic Optimization
- Hydrokinetic
- Intake Gates
- 市场
- 消防栓
- Regulatory Process
- Renewable Integration
- Sediment Transport
- Shoreline 而且 Riparian 资源
- Spillgates
- 潮汐
- Transmission Services
- 涡轮
- Water Management
- Water 资源
- Water Systems
- 波
Conventional Hydro
Data-Driven Approach for 水电 Plant Controller Prototyping using Remote Hardware-in-the-Loop (DR-HIL)
Lead Companies
NREL
Lead Researcher (s)
- Mayank Panwar, Mayank.panwar@nrel.政府
Real-time prototyping of hydropower plant controls is important for reducing the cost 而且 the risk of field deployment. In this project, we propose to 1) collect design 而且 operational data from actual hydro plants 而且 2) use a physics-informed machine learning approach for real-time emulation of hydropower plants, including the hydro turbine 而且 hydrodynamics. The data-driven models will be interfaced with digital real-time simulation at NREL’s Flatirons campus for hardware-in-the-loop (HIL) testing of the governor hardware device or controller-HIL (CHIL). The proposed approach will also establish the connectivity-based remote CHIL testing capability using real-time data streams from an actual hydro plant. This integrated data-driven hydro-plant emulation with CHIL will be used to prototype hydro-governor controls 而且, in the future, provide an opportunity to test hydropower integrated with various technologies (e.g., conventional 而且 renewable generation, energy conversion, etc.),边境. 技术 Application
Conventional Hydro
Research Category
Powerhouse Equipment
Research Sub-Category
州长
状态
正在进行的
Completion Date
TBD
Conventional Hydro
Emulating 水电 in a Controlled Real-world Environment at ARIES for Rapid Prototyping of Next-generation Hydro-controls [HydroWIRES]
Lead Companies
NREL
Lead Researcher (s)
- Mayank Panwar, Mayank.panwar@nrel.政府
This project aims to solve the industry problem of risky, 昂贵的, 而且 time-consuming field validation of new hydropower governor controls by developing a controlled lab environment for evaluation. In this environment, researchers will be able to easily plug in real controller hardware to test under various grid conditions. This effort will utilize a variety of ARIES’ tools, including digital real-time simulation, actual hardware grid controllers, digital governors, variable speed hydro-generator, 和更多的. 技术 Application
Conventional Hydro
Research Category
Powerhouse Equipment
Research Sub-Category
州长
状态
正在进行的
Completion Date
TBD
Don’t see your waterpower research?
Have questions about WaRP?
Contact Marla Barnes at: marla@lisaraittmp.com